Transloading for Montana Department of Transportation Highway Interchange Project

pipe car

The Port of Montana was able to assist with the transload of pipe for the Helena MDT highway interchange project.  The pipe was shipped to the Port of Montana, and then kept in outside storage until the project was underway. Once the project was ready to take delivery of the pipe, it was loaded onto trucks and shipped to the project laydown area.

 

Leave a Reply

Your email address will not be published. Required fields are marked *